Information systems needs to upgrade one of our network storage systems. This system stores the following data:
* Marketing: photos, design, videos
* CJP: images
* Print shop storage
* Podcasts storage
These drives will be unavailable during the outage.
We expect that several outages will be required based on previous experience
with this system. We want to schedule the first outage during the work week to
access timely vendor support. We will try to minimize the disruption caused by
future outages.