The calendar server is reporting high utilization and needs to be restarted.
All posts by admin
ST server rebooted
ST had memory issues and needed to be rebooted.
Web application updates
InfoSys will be updating several web applications. Service disruptions will be only a few minutes in length.
Scheduled SIS upgrade – Jenzabar EX & myEMU
Outage from 8:00 a.m. until approximately 8:00 p.m., to upgrade EX to 3.6.2 and myEMU to JICS 7.2.1. SIS and myEMU may be ready before 8:00 p.m., but check this page to determine the status before attempting to log into either system.
EX users: You may not be in the software until we announce here that it is ready to use, else data loss may ensue.
myEMU users: You will experience an outage as well.
Scheduled calendar database maintenance
Regular upkeep for the calendar database.
SIS Play Database refresh
On Thursday evening at 5:00 pm, the Play Database will be taken off-line to be refreshed from the production Jenzabar EX DB, in preparation for vendor consulting on Friday.
The Play Database will again be available at 8:00 AM Friday morning.
Short Internet outage – Firewall reboot
To upgrade IOS on the firewall – it required a reboot.
Brief planned email outage
As part of the ongoing email storage expansion project, a brief outage of the server is required to disconnect the old storage so that it can be reused on other systems.
FS server needs to be rebooted
FS server needed to be rebooted due to memeory issues
Library network outage
The connection between the Campus Center and the Library has failed, affecting network connectivity to the Library.
We are currently looking for the cause of the problem.