To upgrade the IOS on the firewall it needs to be rebooted.
Tag Archives: Scheduled
SIS and myEMU server update
There will be a short outage of Jenzabar EX and myEMU, until approximately 6:30 am, to install updates to the database server.
Wireless outage to install new IOS
To install a new IOS the wireless controllers need to be rebooted.
EX FAM module outage, PowerFAIDS 18.0
For those of you that use the Financial Aid module, there will be an upgrade planned for Tuesday afternoon from 8:00am until 11am. Please stay out of the FAM module while we get PowerFAIDs up to date to version 18.0.
You may use any other part of EX during this time.
Scheduled Third Saturday Maintenance: Moodle, myEMU, www
Brief outages are planned for Saturday morning that will affect the following services:
* myEMU (up)
* EX (SIS) (up)
* EMU website (www) (up)
* Moodle (up)
* Calendar (up)
We expect these services to be unavailable for well under 30 minutes.
Network storage server upgrade
Information systems needs to upgrade one of our network storage systems. This system stores the following data:
* Marketing: photos, design, videos
* CJP: images
* Print shop storage
* Podcasts storage
These drives will be unavailable during the outage.
We expect that several outages will be required based on previous experience
with this system. We want to schedule the first outage during the work week to
access timely vendor support. We will try to minimize the disruption caused by
future outages.
Print, Copy, Scan Outage
Users will be unable to print, copy, or scan for approximately 30 minute while updates are installed on the Equitrac server to resolve an issue with scan-to-email.
Internet and systems outage – Moodle and printing continuing
We will be updating core network infrastructure. Please expect disruptions as follows:
– 8:30 – 9:30am: Internet connection
– 8:00 – 12:30pm: Many EMU servers including moodle, mail, myEMU, web, file and print services.
– 12:30 – 2:45pm: Moodle and calendar.
Technicians encountered some problems during their work but were able to solve them within an extended outage. We appreciate the community’s patience.
Illiad, SGadmin Outage
The Illiad and SGadmin servers need to be shut down to enlarge their disks. This will affect Sophos and the interlibrary loan system. The outage should last about 15 minutes
Play Database offline (to be refreshed)
The Play Database for EX WAS NOT taken off-line to be refreshed from the production database, in preparation for a Business Office test, as previously scheduled for October 2.
It will instead be refreshed as part of the EX 4.3.3 upgrade, in progress.