Equipment failure has interrupted telephone service for Northlawn 4th floor, as well as some of Northlawn 3rd floor.
We anticipate having the equipment replaced by the end of the day.
Equipment failure has interrupted telephone service for Northlawn 4th floor, as well as some of Northlawn 3rd floor.
We anticipate having the equipment replaced by the end of the day.
Some portions of the web site will be reconfigured. The web server may be unavailable during this process.
Many major systems will be unavailable while a routine upgrade is made to our Novell NetWare file servers. Additionally, routine maintenance procedures will be performed on all network servers.
All services that require the Royal username and password will be inaccessible for most/all of the outage period.
Blackboard, Internet access and the SIS will remain available.
We’re experiencing an Internet outage, and are looking into the cause of the problem.
The problem was resolved.
There will be an interruption of email lasting a couple of minutes as an upgrade is made to email server software. This upgrade keeps our software current and should enhance the performance of Webmail.
Due to unexpected problems with aging hardware, the ST server drives will be transferred to different server hardware. Students will not be able to access P: drives or log in to Novell while this procedure is taking place.
A major network switch needs to be replaced.
About 2:30pm Info Systems began receiving reports that the EMU web server was not available. Early indications were that the trouble was with the network. As Info Systems dug deeper into the problem it became apparent that several servers were inaccessible.
As of 4:00pm Info Systems isolated the problem to be a network hardware component but the full extent of the problem is still being determined. As individual server connections are identified as not working they are being re-located to different connections on the network that are functioning.
4:30 Update: All affected servers have been moved to functioning network ports.
The webserver was unresponsive. All systems are now functional.
The calendar server was unresponsive, and was restarted.