Upgrade the 6509 IOS and the MSFC IOS to allow for the use of the new copper based GBICs. Changed all trunking from ISL to DOT1Q. Had problems in the seminary with the link between the 3550-48 and the 3524 on the 1st floor. It is possibly a bad gigastack on the 3524.

Upgraded the Pix to IOS 6.2.2 to allow for testing and use of VPN’s for Lancaster as well as for the windows client.

A flash card will now need to be purchased for the 6509 to allow for failover and for future upgrades – not enough memory on the board anymore.

All Novell servers, but NS, are patched to the latest service packs for pervasive software. I’m leary on doing NS since these SP’s affect Btrieve, which Novastor uses.

Dan

Duration: 10 hours

Assigned Technicians: Dan Marple Jr