1-1/2 Hr Planned Internet Connection Outage

Tuesday June 11, 2002 10:30am - 12:00pmInternetadmin

Installation of new T-1 line. Disconnect of an existing T-1 line. EMU is changing Internet providers. 1-1/2 hour duration is reserved for this outage. We are optimistic that the actual outage will be less then this. All Internet connectivity will be lost during the actual outage. Incoming and outgoing email will be queued.

2 Hr EMail Maintenance Outage

Saturday June 8, 2002 6:00am - 8:00amEmailadmin

Maintenance outage to secure updated OS image.

15 Min – Planned reboot all Novell servers

Tuesday May 21, 2002 7:00am - 7:15amUncategorizedadmin

All novell servers were rebooted to install some new software.

5 Hr. FS crashed in AM.

Thursday May 16, 2002 2:00am - 7:45amNetworkadmin

5 Hr FS crashed – could be because of NWFTPD

25 min FS LDAP Process abended

Wednesday May 15, 2002 12:49pm - 1:05pmNetworkadmin

On FS Novell server the LDAP process abended. The server was able to be easily rebooted.

LDAP unavailable – 25 minutes
Total down time – 10 minutes

1.5Hr NTP / Timesync problems on ST Novell server

Tuesday May 7, 2002 7:45am - 9:10amNetworkadmin

ST server keep locking up due to Timesync problems. Had to bring the server up in debug mode and manually remove NTP configuration.

15 Min Planned Outage on Student Novell (ST) Server

Tuesday May 7, 2002 7:30am - 7:45amFile Serveradmin

Planned Reboot of Student Novell (ST) Server. A component within the Novell system is not functioning properly. Reboot of server required to fix it.

1+ Hr Outage on EMail Server

Wednesday May 1, 2002 10:30pm - 11:30pmEmailadmin

EMail server taken off-line for to image the system prior to significant diagnostics for some on-going IMAP email problems.

2+ Hr Planned Internet Connection Outage

Wednesday May 1, 2002 11:45am - 2:00pmInternetadmin

EMU Internet connection taken down for reconfiguration of second T-1 line. Returned to service, formally, at 2:00pm.

2hr Planned Outage on EMail Server for Reconfiguration

Tuesday April 23, 2002 6:00am - 8:00amEmailadmin

2hr planned outage on mail.emu.edu email server for reconfiguration. Info Systems is in the process of converting to a new email system. This reconfiguration is necessary in order to correct some operational problems we have been having since moving to new email server hardware in March.

Posts navigation

← Older posts
Newer posts →

Recent Phishing Attempts

Recent Posts

  • Unscheduled: Moodle is down
  • Scheduled: PaperCut Upgrade 9/24/26 9:00AM – 10:00AM
  • Unscheduled: Moodle messaging is broken
  • Unscheduled: Confluence Unavailable
  • Unscheduled: myEMU Directory Slowness

EMU Archives

  • October 2026 (1)
  • September 2026 (1)
  • August 2026 (2)
  • July 2026 (7)
  • June 2026 (3)
  • April 2026 (3)
  • View complete archives

Technology Systems

  • File Server (299)
  • Uncategorized (163)
  • Student Information System (Jenzabar EX) (144)
  • Network (108)
  • Internet (105)
  • View all systems

RSS Feed

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
Copyright 2026 - Eastern Mennonite University