A problem with a managment utility requires that FS be rebooted.
All posts by admin
SIS Operating System Upgrade
The Student Information System (iSeries, Campus Web) will be unavailable all day Monday, Oct 24 for an operating system upgrade to V5R3.
The systems affected will be Jenzabar application software (TEAMS2000) and CampusWeb (https://campusweb.emu.edu). CampusWeb provides student access to their financial information (billings and FinAid) as well as final class grades.
No other systems are affected by this outage.
SIS Outage Oct 23
The SIS will be unavailable for a system backup.
Novell fileserver software updates
All fileservers (affecting network file access and printers) will be updated to resolve specific problems and keep our systems up-to-date.
Mail server hardware upgrade
The primary e-mail server will be moved to a new, more powerful system. When completed, the upgrade should be seamless. Mail will be stored for delivery during the outage.
FS server crashed
FS file server crashed – memory allocation error. Server was rebooted.
Terminal Services Outage – Lancaster
Terminal Services were unavailable for Lancaster users due to network connectivity problems.
ST server is unavailable
The server became unavailable. Technicians are restarting the server.
The server became unavailable again. Technicians are working on diagnosing the problem.
Network outage – lehman, soc, bible, iep
There needs to be a piece of network equipment swapped out. This is expected to take 5 min. It will disrupt network connectivity from the following buildings: Lehman, Sociology, Bible, and the IEP house.
Partial Power Outage
A squirrel shorted a circuit on campus causing one of the electrical phases to be lost. This brought power down on one battery backup system in the Info Systems Data Center which affected several servers including CampusWeb (AS400), email/webmail, Oracle calendar, Terminal Server and a Novell server. Power was restored about 9:05am and the off-line servers were be brought back on-line by 9:45am.